Restoring power to dormant conveyor belts, machinery, and blast doors requires collecting color fuses and positioning power cells across the factory floor.
Installing Color Fuses
Several industrial chambers contain dead breaker panels that prevent security doors from operating:
1. Search nearby storage rooms, shelves, and containers to find individual fuses: Color fuses blue, Color fuses green, Color fuses red, and Color fuses yellow.
2. Locate the central Fuse panel on the wall.
3. Interact with the panel using the required fuse colors. As you install them, the block state transitions through Fuse Panel1, Fuse Panel2, Fuse Panel3, and Fuse Panel4.
4. Once all required slots are filled, power will flow to nearby wiring, opening connected doors.
Connecting Batteries and Energy Modules
Heavy machinery rooms require localized battery packs rather than wall fuses:
1. Pick up a Battery or Energy Module found within the factory sector.
2. Locate an empty Battery compartment or an Energy Receiver block positioned near the locked machinery.
3. Interact with the Battery compartment to slot the battery inside.
4. Ensure energy transfer lines between Energy giver nodes and Energy Pylons are unblocked so the target machine powers up.
