How to Produce Syngas
Controller Setup
Place a Syngas Producer Controller. Build its structure from Iron Frame and Iron Tubing. Attach an Item Input Port for solid inputs and a Fluid Output Valve for the Syngas output. Add a Gas Intake Valve if the process requires a gas input.
Inputs
Feed the required solid items through the Item Input Port. Use a Fuel Tank to buffer any fluid inputs. The Syngas Producer Controller converts the inputs into Syngas, which exits through the Fluid Output Valve. Store Syngas in a Fuel Tank or pipe it directly to a Gas Turbine controller.
Output and Use
Syngas leaves the controller as a fluid. Route it with Fluid Output Valve and Fluid Intake Valve connections to the Gas Turbine controller's fuel input. A Syngas Bucket can be used to move Syngas manually if piping is not yet set up. Use a Sensor Module on the Fuel Tank to detect Syngas level and a Redstone Control Module on the Syngas Producer Controller to start and stop production automatically. Combine with a Gas Mix Compressor and Mixing Chamber if your turbine setup requires a mixed gas feed rather than straight Syngas.